My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17165
DRMS
>
Back File Migration
>
Revision
>
REV17165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:28:43 AM
Creation date
11/21/2007 11:22:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
11/15/1999
Doc Name
GOLDEN EAGLE MINE PN C-81-013 BLM & OSM NOTIFICATION
From
PEAK PROJECT MANAGEMENT
To
DMG
Type & Sequence
TR50
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P 194 728 452 <br />Ronald G. Thompson <br />Peak Project Management <br />3500 County Road 63.9 <br />Trinidad, Colorado S10S2 <br />(719)546-2427 <br />October 26, 1999 <br />N <br />OI <br />m <br />Q <br />Mr. Lawrence Kline, Director c <br />OSM West Regional Coordination Center m <br />1999 Broadway, Suite 3320 ~ <br />Denver, CO 80202-5733 0 <br />to <br />via Certified Mail P 19d 728 152 a <br />Re: Golden Eagle Mine: Permit No. C-81-013 <br />Approval of Technical Revision 50 <br />Dear Mr Kline: <br />US Poslel Service <br />Receipt for Certified Mail <br />No Insurance Coverage Provided. <br />Do not use tar Intemafbnel Mail (See reverse) <br />to <br />street a Nu~er <br />rpc,Qw <br />Sw 33 <br />OI m, Seta, 8 LP Cade <br />L • 57,E <br />P°'"°° s 3 . z o <br />CeniBed Fee r <br />Spedd [krnary Fee <br />Rssettled Defwry Fee <br /> <br />wtlarfl Q C <br />S <br />HfeLll <br />I)s1e,8 Y ~ <br />~ <br />ror~ P qe ~' <br />5. 8 5 <br />POeen Or <br />ASPS <br />Enclosed is a copy of Technical Revision 50 to the Golden Eagle mining permit as approved by the <br />Dtviston of Minerals and Geology. This revision. submitted to response to the Mid-term Permit Review <br />by Di,1G, includes the following items: <br />DMG Approval Document <br />Permit pages iv, vi, vii. 2.03-1 through 2.03-12, 2.Od-30 (a). 2.05-19 (a), 20.21. & 26 <br />Exhibit I Certification of permit content by a company official <br /> Reclamation Bond <br /> Certi£cate oFlnsurance <br />Ntap I Surface Ownership <br /> Supplement Pages I-~ <br />Map 2 Coal Ownership <br />Map 3A Golden Eagle Mine Plan <br />Map 3B Revised Permit Boundary and Permit Area <br />:Map 9 Vegetation <br />Map 12 Surface Disturbance and Past Mining Land Use <br />Map 13 Proposed Post Mine Topography <br />Map I6A Stroud Oil Properties -Golden Eagle Pipeline. As-Built <br />Please contact me if there are any questions. or tf you need additional information. <br />S ~~ <br />Ronald G. Thompsoc~ n ' <br />for Bastn Resources Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.