Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION Or MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />7 313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />August 19, 2003 <br />Stephen C. Fearn <br />Gold King Mines Corporation <br />P.O. Box 299 <br />Silverton, CO 81433 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Larry Perino Greg E. wal~6er <br />Sunnyside Gold Corporation Executive Director <br />P.O. Box 177 Ronald W. Canany <br />Acting Division DireROr <br />Silverton, CO 81433 <br />RE: DMG Acceptance of Bulkhead Design at Mogul Mine, <br />Consent Decree and Order, Case 94 CV 5459, <br />Sunnyside Mine, Permit No. M-1977-378. <br />Dear Mr. Fearn and Mr. Perino: <br />On August 15, 2003, DMG completed its review and accepted the proposed designs for a <br />bulkhead in the Mogul Mine tunnel. John F. Abel, Mining Engineer, prepared the bulkhead <br />designs. Please find enclosed, copy of DMG staff memo regarding DMG review of the <br />submitted bulkhead designs. <br />Per your request, DMG has scheduled apre-pour inspection of the bulkhead preparations for <br />Tuesday, August 19, 2003, beginning at 1400 hours. <br />Please contact me at the DMG Durango Office, 701 Camino del Rio, Room 125, Durango, <br />CO 81301, phone (970) 247-5469, if you have any questions. <br />Sincerely, <br />~~~z~~/. <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />Enclosure: DMG memo from James Dillie, dated August 15, 2003. <br />cc: Harry Posey, DMG <br />James Dillie, DMG. <br />