Laserfiche WebLink
<br />McClane Canyon Mine (Permit No. C-1980-004) <br />Permit Renewal No. 5 <br />Stipulation No. Description <br />26. THE ANNUAL HYDROLOGIC REPORT (AHR) COVERING THE <br />PREVIOUS WATER YEAR FOR THE MCCLANE CANYON MINE WILL BE <br />SUBMITTED NO LATER THAN FEBRUARY 1 EACH YEAR. <br />27. SEDIMENT REMOVED FROM THE SEDIIvIENT POND MAY BE USED AS <br />A TOPDRESSING OR TOPSOIL SUPPLEMENT PURSUANT TO RULE <br />4.06.2(4)(A), UPON SUBMITTAL OF CHEMICAL AND PHYSICAL <br />ANALYSES DEMONSTRATING THAT THE MATERIAL IS EQUAL TO OR <br />MORE SUITABLE FOR SUSTAINING VEGETATION THAN AVAILABLE <br />TOPSOIL OR OTHER PLANT GROWTH MEDIA. SUCH <br />DEMONSTRATION SHALL BE BASED ON A REPRESENTATIVE <br />COMPOSITE SAMPLE OF THE MATERIAL OBTAINED FROM EACH <br />POND CLEANOUT EPISODE. REQUIl2ED PARAMETERS WILL INCLUDE <br />THOSE LISTED IN 4.06.2(4)(1), WITH THE EXCEPTION OF THICHNESS, <br />DEPTH, COARSE FRAGMENTS, AND AREAL EXTENT. ANALYSES FOR <br />SELENNM, BORON, NITROGEN, AND ORGANIC MATTER WII,L BE <br />INCLUDED IN ADDITION TO THOSE LISTED. POND CLEANOUT <br />MATERIAL, WILL NOT BE PLACED IN THE TOPSOIL STOCKPILE OR <br />USED AS FINAL RECLAMATION TOPDRESSING PRIOR TO OBTAINING <br />WRITTEN APPROVAL FROM THE DIVISION. <br />