My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV16953
DRMS
>
Back File Migration
>
Revision
>
REV16953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:28:28 AM
Creation date
11/21/2007 11:21:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Name
APPENDIX A GEOTECHNICAL FIELD AND LABORATORY QUALITY CONTROL DATA SHEETS
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEPWORTH - PAWLAK GEOTECHNICAL, INC. <br /> ' REPORT OF CONSTRUCTION ACTIVITIES <br /> ITEC Environmental Colorado, Inc. JOB NO. 298 187 <br />. <br /> c/o McCulley, Frick, and Gilman, Inc DATE: 9/3/98 <br />~ <br /> 4900 Pearl East Circle, Suite 300w DAILY REPORT #7 <br /> Boulder, CO 80303 SHEET 1 OF 1 <br /> OJECT: Cash Mine Redevelo ment near Gold Hill, Co (Raise existin tailin s embankment) <br /> FATHER CONDITIONS AND TEMPERATURE: Sunn +70°s <br /> NTRACTORS CONSTRUCTION ACTIVITIES: <br /> <br /> <br /> 'AJOR EQUIPMENT: <br /> P GEOTECH'S SITE ACTIVITIES: <br /> We made a site visit as scheduled to provide compaction tests on the embankment fill, there was not <br /> ~nough fill in place to require testing. We obtained a sample of the embankment fill to return to ou <br /> boratory for moisture-density relationships {Modified Proctor- and classification, the results are shown <br /> on attached Figures 3 and 4. <br /> <br /> RBAL COMMUNICATION WITH CONTRACTOR, ENGINEER, ARCHITECT, OWNER: <br /> ~ <br />e spoke with Len with Lens Excavating, he stated that it would take him two days to place a lift of <br /> embankment fill before he would be in need of compaction testing. Len stated that he would be placing <br /> II over geo grid throughout the day and there was no compaction specifications for this. <br /> <br /> <br /> 1 <br /> <br /> Dave Cassidy Jim Riley <br /> ' FIELD OBSERVER REVIEWED BY <br />
The URL can be used to link to this page
Your browser does not support the video tag.