Laserfiche WebLink
Stegner Farms Pit <br />Slurry Wall <br />Trench Depth Worksheet <br />(Work Completed April 12 through May 6, 2000) <br />Depth to Depth of <br />Station Bedrock Trench 4/12 4/13 4/14 4/24 4/25 4/26 4/27 4/28 4/29 5l1 5l2 5/3 5/4 5/5 5/6 <br />0+00 17.0 20.0 20.0 17.5 20.0 BTS <br />0+50 17.0 20.0 20.0 18.0 BTS <br />1+00 16.5 20.0 20.0 19.0 17.5 BTS <br />1+50 16.5 20.5 20.5 17.5 3.5 BTS <br />2+00 17.0 20.5 20.5 19.0 19.0 9.5 BTS <br />2+50 17.5 22.0 22.0 15.5 9.5 BTS <br />3+00 17.0 20.5 20.5 18.0 15.5 6.0 BTS <br />3+50 18.0 21.0 20.0 20.0 15.0 BTS <br />4+00 17.0 21.0 19.0 20.0 17.5 6.0 BTS <br />4+50 17.0 21.0 19.5 20.0 20.0 15.5 BTS <br />5+00 17.0 21.0 21.0 19.5 19.0 BTS <br />5+50 17.0 22.0 22.0 21.5 BTS <br />6+00 17.0 22.0 22.0 18.5 BTS <br />6+50 17.0 22.0 22.0 19.0 BTS <br />7+00 19.0 23.0 23.0 BTS <br />7+50 16.5 21.0 21.0 BTS <br />g+00 17.0 21.0 21.0 9.0 BTS <br />8+50 16.5 21.0 21.0 15.0 BTS <br />g+00 16.5 21.0 21.0 20.0 BTS <br />9+50 16.5 21.0 21.0 BTS <br />10+00 17.0 21.0 21.0 BTS <br />10+50 17.0 21.0 21.0 BTS <br />11+00 17,0 20.0 20.0 BTS <br />11+50 17.0 20.0 20.0 14.0 BTS <br />12+00 17.0 21.0 21.0 20.0 BTS <br />12+50 16.0 20.0 20.0 18.0 BTS <br />13+00 16.0 19 0 19.0 BTS <br />13+50 17.0 21.0 19.5 BTS <br />14+00 16.0 20.0 20.0 BTS <br />14+50 16.0 20.0 20.0 BTS <br />L J <br />u <br />Stegner Trench Depth.cls I Apr 12 to May 6 <br />