Laserfiche WebLink
<br />ROCKY MOUNTAIN CONSULTANTS, INC. <br />III IIIIIIIIIIIIIIII <br />RECEIVE® <br />May 9, 2000 <br />Ms. Christina Kamnikar <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />MAY 15 2000 <br />Division of Minerals 8 Geology <br />Re: Stegner Farms Pit Slurry Wall, Biweekly Summary Report <br />RMC Job No. 19.0636.059.00 <br />Dear Ms. Kamnikar: <br />~ ~nC <br />Premiere Building <br />825 Delaware Ave.. Suite 500 <br />Longmont, CO 80501 <br />(303) 772-5282 <br />Metro (303) 665-6283 <br />FAX (303) 665-6959 <br />(first initial, Iasi name)@long.rmcco.com <br />Enclosed are the daily lags, trench depth worksheets, and quality control test summaries for the slurry wall construction <br />completed between April 10 and May 6, 2000 at the ahove~referenced project. Beginning with this submittal, additional , <br />reports will be submitted every two weeks until completion of the slurry wall. <br />Please feel free to call with any questions or comments. <br />Sincerely, <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br />~~s~ ~~-- <br />Colby J. Hayden, P.E. <br />Project Engineer <br />CJH:sp <br />Enclosures <br />IMepwelOeR~ i9108J8 R1815umury ReponCi0~R0.wpd <br />CIVIL AND ENVIRONMENTAL ENGINEERING PLANNING <br />