Laserfiche WebLink
J <br /> <br />• i <br />Attachment A <br />CYCC Topsoiling and Reclamation Activities <br />page 2 <br />October <br />13 Saturday - no reclamation work <br />14 Sunday - no reclamation work <br />15 blading topsoil over buried water tank above office <br />16 topsoil work over water tank, gully repair by tipple <br />17 snowfall - no reclamation work undertaken <br />18 snowfall - no reclamation work undertaken <br />19 snowfall - no reclamation work undertaken <br />20 Saturday - no reclamation activities <br />21 Sunday - no reclamation activities <br />22 surveying diversion ditches Area 31 <br />23 diversion ditch work Area 31 <br />24 diversion ditch work Area 31 <br />25 diversion ditch work Area 7 <br />26 chiseling Mine 3 <br />27 chiseling Mine 3 <br />28 seeding Mine 3 <br />29 seeding Mine 3 completed <br />30 surveyed and cut ditches Area 31 <br />31 surveyed and cut ditches Area 7 <br />November <br />1 cut ditches in Area 31 <br />2 cut ditches in Area 7 <br />3 Saturday - no reclamation activities <br />4 Sunday - no reclamation activities <br />5 cutting contour furrows Mine 3 <br />6 cutting diversion ditches Mine 3 <br />7 cutting diversion ditches Mine 3 <br />8 dozer to Mine 3, gully repair and ditch construction <br />9 cut ditches and contour furrows on seeded area Mine 3 <br />10 drainage ditch construction to Mine 3 pond <br />11 Sunday - no reclamation activities <br />12 completed ditch and cut contour furrows on OB stockpile Mine 3 <br />13 gully repair south end of Mine 3 toward OB stockpile <br />14 moved dozer to fertilizer plant to push mud main mine <br />15 no more work done in 1984 - snowed out <br />May 20, 1985 cut furrows on Mine 3 (less than 4 hours) <br />May 23, 1985 cut contour furrows on Mine 3 <br />May 24, 1985 cut contour furrows on Mine 3 <br />