Laserfiche WebLink
\. <br />~.. <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No. NOV c-91-024 <br />NATURE OF VIOLATION: <br />' a contour <br />and to backfill so as to eliminate all highwalls. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) 34-33-120(2)(c) <br />REGULATION SECTION(S) 4.14.7(~L(al <br />PERMIT SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Fruita No. 1 Bench Area <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1. Submit a revision to the existing reclamation plan with plans for backfilling <br />and grading the Fruita No. 1 Bench Area with material from the rock pile below the <br />bench to return the area to a~,p oxima o ;e;nal on oar ;n a o dan a with Rule <br />--G 1~i7 and 2. imnlement the modified elan as aooroved by the Division OR 1. Modify <br />the existing plan such that a steep slope AOC variance is approved in accordance with <br />Rules 2.06.5 and 6.27~and 2. implement the approved plan, as modified. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE <br />19_ <br />Step 2 - Before December Y6, 1991 <br />d-3 <br />(Rev. 5/85) <br />Doc. No. 221 <br />