Laserfiche WebLink
CIRCES Cost Estimating Software <br />7RUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task # : 002 State :Colorado Permiffob # : M-1977-378 <br />Date : 12/03/2003 County :San Juan Abbreviation :none <br />User : WHE Site : Sunnyside Mine Filename : M378-002 <br />Permit or otherjob action :AR-02 <br />Task description :Construct 2' clay liner, Lake Emma subsidence <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />TrucWloader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CAT 966G high lift <br />Support equipment -Load area : Cat D8R Series 11 - 8SU <br />-Dump area : CAT 825G <br />Road maintenance -Motor grader : NA - <br />-Watertruck : NA <br />Cost Breakdown : TrucWLoad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozar compact NA NA <br />Utilization-machine : 100 88 25 100 NA NA <br />-Ripper attachment : NA NA 25 NA NA NA <br />Ownership cost/hour : $20.33 $28.46 $49.85 $66.46 NA NA <br />Operating cosifiour : $27.50 $26.33 $16.67 $54.97 NA NA <br />Ripper op. cost/hour: NA NA $1.76 NA NA NA <br />Operator cost/hour : $21.72 $31.83 $31.83 $37.83 NA NA <br />Unit subtotals : $69.55 $86.62 $100.05 $153.27 NA NA <br />Number of units : 2 1 1 1 0 0 <br />Group subtotals : Work : $225.72 Support : $253.32 Maintenance : $0.00 <br />Total work team cost/hour : $479.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,500 LCY factor: NA volume: 10,500 LCY <br />Source of quantity take-off : Exhibit L & C46 <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,700 pounds/LCY Struck volume : 12.00 LCY <br />Descr.:Sand and clay -loose Heaped volume : 78.00 LCY <br />Rated payload : 50,300 pounds Average volume : 75.00 LCY <br />Payload capacity : 78.63 LCY Adjusted volume`: 78.00 LCY <br />Final truck volume based on number of loader passes : 14.96 LCY <br />'yuck volume aCWsted to not a:me etl *atetl paNoatl or heapatl volume <br />Loading Tool Caoaciri : ob Condition Corrections : Site altitude (ft.) : 12,000 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.: Other -moist loam (700-770 % J Altitude adJ.: 0.890 0.780 (Gat HB) <br />Bucket fill factor : 1.050 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 4.987 LCY Net correction : 0.739 0.647 <br />