Laserfiche WebLink
IRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION 7 DEMOBILIZATION <br />Agency or organization nacre : DMG <br />Task k: 020 State:CObretlo PenrtiUgC A: M-1977]78 <br />Date: 72/042003 County: San JUen Abbreviation :none <br />User: WHE Site:Sunnyskie Mine Filename:M378-020 <br />Penrtit or other job action : Ar-02 <br />Task description :Haul reclamation equipment to ono Irom Herbert Placer <br />'RANSPORT RIG COST Shin basis : 1 per tlay <br /> Cast data source: CRG Data <br />Track tractor description :Generic on-hghway truck tracrog 6x4, diesel powered, 400 HP <br />Track treiler tlescnption :Generic loltling gooseneck, drop tleck equipment fretier (257, 50T, antl f00T) <br />Availableri capacities: Q25 Tons 2650 Tons 51+Tgns <br />Cost Breaktlovm: Ownership costrhour: $2d.34 $26.99 $33.09 <br />Operating cost/noun $2849 $30.2] $34.34 <br />Operator wsMour: $2]OJ $2]OJ $2ZOJ <br />Helper cosghour: $000 823]8 $23]8 <br />Total Unit COSI/hpeC $]9.90 8108.11 $11826 <br />NON-ROADABLE EOUIPMEt~ <br />Mechine <br />Description Weighgunit <br />(Tons) Ownership <br />CosVhr/unit Heul Rig <br />CosHhr/unit Fleet Size <br />(NO. units) Haul Trip <br />CosuhrRleet Realm Trip <br />CosVhrMleet DOT pemtlt <br />CostHleet <br /> <br />-Cat DBR Series ll-BSU 52.55 $49.85 $118.28 1 $168.13 $118.28 $0.00 <br /> <br />-Revagefatbn equip 20.00 $20.00 $79.90 1 $99.90 $]9.90 $0.00 <br /> <br />-Reveg /eilure 10.00 $10.00 $79.90 1 $89.90 $79.90 $000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals: 595793 5229.08 $0.00 <br />ROADASLE EQUIPMENT <br />Machine <br />Description <br />Total <br />Cosvhourbnit <br />Fleet Size <br />(NO. units) <br />Haul Trip <br />Cast/nrRleet <br />Retum Trip <br />CosVhrRleM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals: 50.00 50.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within projsctarea region: Montrose <br />Transportation CVCle Time: Non- Total one-way travel tlistance: 63.0 mules <br /> Roatlable Roatlable Average travel speetl: 40.0 mph <br /> Equipment Equipment <br />Haul time (hours)= 1.5] 1.5] Total nomroatlable rtwWtlenab cost': $2,]19.30 <br />Retum time (hours) = 1.5J 1.SJ • rva room trice vdth Fein rig <br />LOatling time (hours)= 0.50 NA Total roatlable npb/tlenpb cost": $000 <br />Unloading time (hours)= 0.50 NA ^one room trip. po haul rip <br />Subtotals= 4.15 3.15 <br />JOB TIME AND COST ,Total job time: 8.30 hours <br /> Total job cost: 52,719 <br />