Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :OMG <br />Task # : 014 State :Colorado PermiUob # : M-1977-378 <br />Date : 72/04/2003 County :San Juan Abbreviation :none <br />User : WHE Site : Sunnyside Mine Filename : M378-014 <br /> <br />Permit or other job action : AR-02 <br />Task description :Construct 2' eartften cover for Mayflower Pond 4 <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />6X4 <br />D8R Series 11 - 85U <br />OSR Series 11 - 8SU <br />Shift basis : 1 per day <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine : 100 97 25 700 NA NA <br />-Ripper attachment : NA NA 25 NA NA NA <br />Ownership cosUhour : $20.33 $28.46 $49.85 $43.83 NA NA <br />Operating cosf/hour: $2750 $29.00 $16.67 $66.44 NA NA <br />Ripper op. cosf/hour: NA NA $1.76 $0.00 NA NA <br />Operator cost/hour : $21.72 $31.83 $37.83 $31.83 NA NA <br />Unit subtotals : $69.55 $89.29 $100.05 $742.10 NA NA <br />Number of units : 2 1 1 7 0 0 <br />Group subtotals : Work : $228.39 Support : $242.15 Maintenance : $0.00 <br />Total work team cosUhour : 5470.54 <br />Initial Swell Loose <br />volume: 25,813 LCY factor: NA volume: 25,813 LCY <br />Source of quantity take-off : (BacJ(43560s//ac)(2'D)/27= 25,813.3 cy <br />Source of estimated swell (actor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,650 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 25% rock, 75% earth Heaped volume : 78.00 LCY <br />Rated payload : 50,300 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.98 LCY Adjusted volume': 78.00 LCY <br /> Final truck volume based on number of loader passes : 15.68 LCY <br /> 'truck volume atljustetl to not eme etl rated payload or heapetl volume <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (tt.) : 1 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader S <br />Descr.: Other - rock/dirt mixtures (100-720%) Altitude adj.: 0.970 0.850 (C <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 s. <br />Adjusted bucket capacity : 5.225 LCY Net correction : 0.805 0.705 <br />