My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-10_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2003-12-10_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:25:06 PM
Creation date
11/21/2007 11:19:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
12/10/2003
Doc Name
Cost Summary Form
From
CIRCES
To
DMG
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Task # : 011 <br />Date : 12/04/2003 <br />User : WHE <br />State :Colorado <br />County :San Juan <br />Site : Sunnyside Mine <br />Agency or organization name : DMG <br />Permit or other job action :AR-02 <br />Task description : Backfill Cement Creek diversion cut <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 325C L <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cosUhour <br />OperatorcosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />initial <br />volume : 1,333 LCV <br />Utilization <br />Swell <br />factor : NA <br />$32.47 NA <br />$36.45 100 <br />$32.02 NA <br />$100.94 <br />Source of estimated volume :TR-19 reclamation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swinc loaded, dumb bucket. swing em <br />PermiUjob # : M-1977-378 <br />Abbreviation :none <br />Filename : M378-011 <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $100.94 <br />Loose <br />volume : 1,333 LCY <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 11,000 feet Altitude adjustment : 0.94 I (Cat HB) <br /> Job efficiency adjustment : 0.83 (] shift/day) <br /> Net job correction : 0.78 multiplier <br />Unadjusted hourly unit production : 386.42 LCY/hour <br />Adjusted hourly unit production : 301.48 LCY/hour <br />Adjusted hourly fleet production : 301.48 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 4.42 hours <br />Unit cost ; $0.335 per LCY Total job cost : $446 <br />
The URL can be used to link to this page
Your browser does not support the video tag.