My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-10_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2003-12-10_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:25:06 PM
Creation date
11/21/2007 11:19:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
12/10/2003
Doc Name
Cost Summary Form
From
CIRCES
To
DMG
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM RFC~i <br />PROJECT IDENTIFICATION <br />Date : 04-Dec-2003 <br />User : WHE <br />Permit or job no. <br />Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit or job action :AR-02 <br />o,~,s OFD' ~~ <br />M-1977-375 =Site :~ ide <br />none State:Co/oradUe/re <br />M378-000 County :San Juan me/®8Y <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Backfil/ subsidence feature at Lake Emma NA 1 113.1 $54,207 <br />002 -Construct 2' clay liner at Lake Emma NA 1 33.9 $16,262 <br />003 -Rip & grade 6 acres at Lake Emma NA 1 56.9 $8,641 <br />004 -Revegetate 6 acres at Lake Emma NA 1 8.0 $5,395 <br /> <br />005 -Backfill2 adits, American & Terry Tunnels NA 1 8.0 $1,476 <br />006 -Rip & grade 5 acres at Terry Tunnel NA 1 43.3 $6,504 <br />007 -Revegetate 5 acres at Terry Tunnel NA 1 8.0 $4,836 <br /> <br />008 -Demolish and remove mine related structures at American Tunnel NA 1 40.0 $29,101 <br />009 -Rip & grade 8 acres at American Tunnel NA 1 76.8 $11,652 <br />010 -Rip & grade 3 acres at Herbert Placer NA 1 14.41 $2,185 <br />011 -Backfil) Cement Creek diversion cut NA 1 4.4 $446 <br />012 -Revegetate 10 acres at American Tunnel NA 10 10.0 $11,085 <br />013 -Revegetate 3 acres at Herbert Placer NA 7 4.0 $3,326 <br /> <br />014 -Construct 2' earthen cover for May/lower Pond 4 NA 1 59.9 $28,196 <br />015 -Finish grade 16 acres at Mayflower Pond 4 NA 1 474 f $7,107 <br />016 -Rip & grade f0 acres borrow area (TR-26) NA 1 17.11 $2,595 <br />017 -Revegetate 16 acres Mayflower Pond 4 NA 1 16.0 $17,736 <br />018 -Revegetate 7 acres borrow area (TR-26) NA 1 8.0 $8,172 <br /> <br />019 -Haul reclamation equipment to and from job site NA 18 8.3 $13,367 <br />020 -Haul reclamation equipment to and Irom Herbert Placer NA 3 8.3 $2,719 <br />SUBTOTALS: $86.2 $235,008 <br />includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br />ovERREAD AND PROFIT - Liability insurance <br />Pertormance bond <br />Job superintendent <br />Profit <br />TOTAL DIRECT COST' ~ $235,008 <br />of direct total = $3,643 <br />of direct total = $2,468 <br />hrs`...$/hr $35.00 total= $10,258 <br />o/direct total = $23,501 <br />'assume net hours = 50% of task hours <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />1.55 <br />1.05 <br />293.10 <br />10.00 <br />7.39 <br />5.00 <br />NA' <br /> TOTALO&P= $39,870 <br />CONTRACT AMOUNT (tlirect+O & P) _ $274,878 <br /> total = <br />_ <br />of cntr. NA total = $20,313 <br />of cntr. NA total = $13,744 <br />NA total = NA <br />'contingencies accounted /oral task level TOTAL INDIRECT C05T= $73,927 <br />TOTAL BOND AMOUNT (direct + indirect) _ $308,935 <br />
The URL can be used to link to this page
Your browser does not support the video tag.