My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26381
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:20 PM
Creation date
11/21/2007 11:17:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
11/12/1993
Doc Name
TEN DAY NOTICE
Violation No.
TD1993020116002TV3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING RECLAMATION AND <br />Mine-Site Evaluation Inspection Report <br /> 10. Type <br />1. Permi¢ce/Person 9. Permit Number a. Permit b. RA <br /> MOUNTAIN COAL CO. C-007-80 PP ~S <br /> 2. Address 11. inspection Date 12. Inspection Type l3. Joint Inspection <br /> <br /> P. O. BOX 591, 1ll08/93 OFl ~ YIN <br /> erw-m-rr <br /> 3. City 4. State l4. Permit Status 15. Site Status 16. Facility Type <br /> SOMERSET CO A~ AP BCEF <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. RSI # 19. Land Cade <br />81434 -~ 303-921-5015 020 <br />7. Operator if Different than Perm ittee 20. M.S.H.A. ID # 21. State Code 22. County Cade <br /> <br /> OS-03672 08 051 <br /> 8. Mine Name 23. AVS Permittce Entity ID Number 23b. State Office <br /> <br /> WEST ELK 109235 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom licence 3=Not Plann 4=Not S =Noncom licence Identified Elsewhere <br />A. Administrative D. BackfiBing & Grading H. 2 Subsidence Control Plan <br />1._Mining within Valid Permil 1. _Exposed Openings I. Roads <br />2._Mining within Bonded Area 2. _Contemporaneous Reclamation 1, Road Construction <br />3._Terms & Conditions of Perm it 3. _Approximate Original Contotu 2.-Certification <br />4._Liability insurance 4. _Highwall Elimination Drainage <br />3. <br />5._Ownership and Control 5. <br />- -Steep Slopes (includes downslope) _ <br />4. <br />Stufacing and Maintenance <br />6._Temporary Cessation 6. Handling of Acid & Toxic Materials- - <br />Reclamation <br />5. <br />B. Hydrologic Balance <br />7. <br />_Stabilizalion (rills and gullies) <br />_ <br />1.-Drainage Control E. Excess Spoil Disposal J. Sigas & Markers <br />2._inspections & Certifications l. _Placement I._Signs <br />3._Siltation Structtues 2. _Drairtage Control 2.-Markers <br />4._Discharge Structures 3. _Stlrface Sabilisaton K. Distance Prohibitions <br />5._Diversions 4. _Inspections & Certifications - <br />6. Effluent Limits L. RevegetatioD <br />7._Ground Water Monitoring F. Coal Mine Waste l._Vegetative Cover <br />8._Strrface Water Monitoring (Refuse Piles/Impoundments) 2.-Timing <br />9._Drainage -- Acid•Toxic Materials ]. -Drainage Control <br />10._Impoundments 2. _Stuiace Stabilisation M.-Postmining Land Use <br />11. Stream Buffer Zones 3. _Placement <br />- 4. _Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. -impounding Structures <br />l._Removal G. Use of Explosives -I) 2 LIGHT USE ROADS <br />2._Substitute Materials <br />P ]. -Blaster Certification <br />2) <br />3. 2 Storage and <br />rotection 2. Distance Prohibitions - <br />4._Redistribution 3. _Blast Strrvey/Schedule <br />3) <br /> 4. _Warnings & Records - <br /> 5. _Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of Last <br />State Complete <br />Inspeaion / / <br /> <br />0 <br />0 <br /> <br />a <br />Permit Review <br /> <br />4276 <br />0 <br />a. Total <br />bonded <br /> . . . 4276.U a Pemti¢ed <br />Frequency for previous 4 Calendar Qtrs. <br />Number of Number of <br />b <br />0 <br />0 <br /> <br />I <br />0 <br />0 b. Phase I <br />released <br />. <br />requires ^ mmplete ^ <br />compete 0 inspeaans 0 . nspection Time <br />b. . <br />104.5 b. Disuabed <br />inspeaions conduaeo <br />~ <br />~ <br />B <br />~ c. Phase II (Estimated) <br />c Numberof Number of ' c. Travel Time • released <br />required ^ partial ^ <br />panrel . 0 inspeaions 0 <br />1.0 <br /> <br />d <br />R <br />Wri <br />i <br />0.0 <br />d. Phase III <br />Page 1 of - <br />mspeaions mnduaed . <br />eport <br />t <br />ng released r„~,~, ,,,~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.