My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26358
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:20 PM
Creation date
11/21/2007 11:17:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
10/15/1992
Doc Name
MOU BETWEEN DMG & BMRI REGARDING AN AGREEMENT FOR ENVIRONMENTAL SAMPLING SERVICES 3RD PARTY SAMPLNG
From
DMG
To
MLRB BRUCE HUMPHRIES MIKE LONG JIM PENDLETON & JIM STEVENS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. The monitoring locations for each third party sampling event shall be <br />designated by DMG in advance of the sampling event and shall be <br />selected from the following approved monitoring locations: <br />a. Groundwater Monitoring Wells M-6, M-7, M-8, M-9, M-12, <br />M-13. ' <br />b. Surface Water Monitoring Site RS-4. <br />c. The Lower and Upper Tailings Ponds and the Collection Pond. <br />3. In the event that DMG determines on the basis of third party sampling <br />that monitoring data obtained from the tailings facilitry by BMRI aze <br />inaccurate or unreliable, DMG may direct the third!pazty sampling <br />contractor to conduct additional independent sampling'and subsequent <br />sample analysis in accordance with the requirements of this MOU, at <br />the sole discretion of the DMG provided that such work is within the <br />work description and budget set forth in the scope of Work attached to <br />the Contract. In the event that such work is not witlnn the scope of <br />work, then DMG may propose a change order to the Contract. <br />B. Direction of Sampling Activity <br />1. The DMG, through its project manager, shall direct the sampling and <br />analytical efforts of the third party sampling contractor. <br />2. The DMG project manager shall schedule sampling activities with the <br />third party sampling contractor. <br />3. The DMG shall provide BMRI a minimum of two working days notice <br />to coordinate the sampling activity with its sampling personnel er <br />contractor. <br />4. In an effort to facilitate coordination and safe working conditions, third <br />party sampling contractor shall report to BMRI persottdel immediately <br />upon arrival at the minesite and shall remain under the direction of <br />BMRI during the course of performing the sampling activity required <br />hereunder. <br />5. Split samples retained by BMRI shall be deemed by TJMG to satisfy <br />any normal required sampling effort scheduled to occ~pr within two <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.