My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26335
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:19 PM
Creation date
11/21/2007 11:17:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990016
IBM Index Class Name
Enforcement
Doc Date
2/3/1998
Doc Name
SOUTH 40 QUARRY PN M-90-016 CORRECTIVE ACTION FOR NOV MV-97-034 & DIVISIONS INSPECTION TO CONFIRM
From
DMG
To
HIGH PLAINS STONE CO
Violation No.
MV1997034
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~~, N • <br /> <br />STATE OF IIIIIIIIIIIIIIIIIII <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmem ui Natural Kesources <br />I i l }Sherman SL, Koom ? 1 5 + <br /> <br />Dem~er. (ulnradu dU'03 ~ <br /> <br />Phony I1U31 db6 i56: I <br />I <br />64X' 110 41 Hit-8106 <br /> DEPARTMEM OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> Govemnr <br /> lames S. lochhead <br /> Eveanrve Director <br /> ntichael B. Long <br /> Division Dnecmr <br />February 3, 1998 <br />Mr. Scott Wagner <br />High Plains Stone Co. <br />P.O. Box 100 <br />Castle Rock, CO 80104 <br />RE: South 40 Quarry (Permit M-90-016) Corrective action for Notice of Violation MV-97-034 <br />and Division's inspection to confirm completion by February 15, 1998. <br />Dear Mr. Wagner: <br />Enclosed is another copy of ]Notice of Violation MV-97-034. As indicated [o you in my Fax of <br />January 20, 1998, the corrective action for MV-97-034 (See Page 3 of the Notice of Violation <br />attached) requires not only the boundaries of the South 40 permit area be mazked but a sketch <br />map of the permiUaffected area be provided after the boundaries have been mazked together with <br />photographs of the markers installed in order to facilitate the Division's subsequent inspections <br />of the site. You indicated in the voice mail message you left me on January 6, 1998 that markers <br />had been installed. You have not, however, supplied the sketch map and photographs. <br />The Division is committed to confirm that the marking of the boundaries of the South 40 Quarry <br />was completed by February 15, ]998 in order that High Plains Stone not be required to pay the <br />remaining $6,100.00 of the total $6,300.00 civil penalty assessed for MV-97-034 (See Page 3 of <br />the Notice of Violation attached). I currently plan to conduct an inspection for that purpose, <br />weather permitting, during the week of February 16, 1998 with or without the sketch map and <br />photographs. <br />As you know, I was unable [o locate boundary markers for the South 40 Quarry during my last <br />two inspections. That is the r•~ason why the sketch map and photographs aze considered <br />important. If, at the time of the February 1998 inspection, I lack the sketch map and photographs <br />of the boundary markers required by the corrective action for MV-97-034 and cannot find the <br />
The URL can be used to link to this page
Your browser does not support the video tag.