Laserfiche WebLink
<br />"' 2. As-Bu11t Report (p. 6, V.G.2) <br />~ . <br />• a. Final site contours <br />b. Plantings as mstaIIed <br />G Figure Format Notd <br /> <br />• All maps and plans submitted ahaII be legible aced Include tale, <br />dau of preparation, aced date of submission. <br />• A legend shaII be provided ffsymbols, patterns. or scrxas are used <br />on the map as place. <br />• If colors are used to mdlcau areas on the original map. cola~r copies <br />shall be lnduded In all copies as the report submitted to the Corps. <br />• Indicate North aced provide a scale sad datum <br />(ff appropriate 1.e. tidal area). <br />Scale and orientation shall be the same for aII maps, e~oeept far <br />detail sections. <br />• Base topo maps (1.e. for )wYsdldional arras, location and size of <br />mitigatton areas, mitigation site preparation plans, planting plans, <br />irrigation plans, and as-buIIt reports) shall be frill-size (1 lath = 100 feet <br />or less, 1 lath = 200 feet for very large p~ro~ects) <br />• USGS quad maps shaII be full-size and fuII scale (maybe <br />photocopies, ff legible) <br />NOTE: Reduced copses of maps sbaIl be bound with aII documents to <br />tactlltate review by advisory agmdes. For Corps review, at least two sets of <br />full-sized copies shall axompaaymttigationand monitoringproposal, and one <br />set shall accompany eat annual report. <br />D. BcheQule <br />When submitting the mitigation and monltoringplan, the applicant shaII . <br />indlrau the month sad dau on which the yearlyreport wIIl be delivered. if plan <br />fawlves planting, thLs dau should be between growing seasons for the primary <br />plants so that timely dedslons can be made about a~modlflcatlons to the plan. <br />i lI <br />