Laserfiche WebLink
<br />D. Planting Plaa <br />1. Briefly describe planting plea and methods. <br />2. Provide a table o[ spedp to be planted, indudiag numbers, <br />spacing, types of pmpagulea, pot sizes, etc. <br />3. Indicatt source-locale of seeds. plant plugs. cuttings, etc. <br />4. Show planting and species locations oa a base topo map. (See <br />AppendlzAJorJtyureformat tnJormaiion) <br />5. ~If transplanting to be done. describe storage method acrd <br />duration. <br />6. Describe a~ ocpected wluateer native revegetation that >s <br />included 1n mitigation planning. <br />E. Schedule <br />Provide a schedulr is the form of a legible flow cbart showing intended <br />ttmtag of site preparation acrd plantings. <br />F. lsrlgatioa Plan <br />1. Lkscribe itsigatian method(s) and estimated frequenry acrd amount <br />during dry months. <br />2. Indicate water source(s) for mitigation area. <br />S. Show planned hz7gation system and/or water flow oa base topo <br />(may include on planting plan map). <br />d. As-Built Conditions <br />The play should spedfy that the applicant wllL• <br />1. Submit a report to the Corps within 6 weeks of completion of site <br />preparation acrd planting, describing as-built status of the mitigation <br />pm~ect. If avoidance is incorporated into development proJeM design. <br />describe as-built status of development proJed:, including air deviations <br />from original play in vicinity of, or that will affect, ~urlsdictional area. <br />Submit separate reports for grading and planting work if not completed <br />within six weeks of each other. <br />Z. Provide topo maps ahowtag as-built contours of mitigation area <br />Indicate location of plantings acrd any other installations or structures. <br />6 <br />