My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-01_REVISION - M1980055HR
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980055
>
2006-06-01_REVISION - M1980055HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:24:50 AM
Creation date
11/21/2007 11:15:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980055HR
IBM Index Class Name
Revision
Doc Date
6/1/2006
Doc Name
Comments
From
International Uranium (USA) Corp.
To
DMG
Type & Sequence
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> Notice of Intent to Continue Mining Operations <br /> 110 2) Hard Rock/Metal and DMO Annual Report <br />Permit tee Name: International Uranium (USA) Corp <br />Permit No. M-80-055-HR <br />Operat ion Name: Topaz Mine <br />Annive rsary Date: February 02, 1998 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage; 9.9 b. County where mine is located: San Migu el <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br /> For 110(2) Operations: Do you extract MORE or LESS than <br /> 70,000 tons of mineral or overburden a year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* -0- <br />5. Total acres reclaimed for the reports year:* -O- <br />6. Total number of acres at topsoil replacement stage: -O- <br /> a. Average topsoil thickness replaced: N/A <br />7. Total number of acres seeded: -0- <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: N/A <br /> a. Dates reclamation began: N/A <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* N/A <br /> <br />10. Estimated total acres to be affected in the next report year:* 2 acres <br />11. coMMENTS: nnine reacuvateg mio-vear lUai1. nnme stte was msoecteg ov um~ inuro?. <br />Warranty increased by DMG 8/15/97. All work will be contained in permit area. A mine site surface <br />remains unchanged. Topsoil stockpiled and natural drainage flow is diverted around the site. <br />* Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />* NOTE: If there }gave not been any changes since the last annual report and you <br />previously submi ed a ap which correctly depicts the current acreage in items 2 through <br />6. then a new ~is necessarv. However. this must be stated above. <br />Signature <br />Date: January 30, 1998 <br />Please tytie or print current contact name, mailing address, and phone number below: <br />contact Name: Michelle R. Rehmann phone: 1 3031 628-7798 <br />FAx No: 1 303) 389-4125 <br />company: International Uranium IUSAI Corp <br />Address: 1050 Seventeenth St.. Ste 950 <br />Denver. Colorado 80265 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.