My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26278
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:17 PM
Creation date
11/21/2007 11:15:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
8/11/1993
Doc Name
FOIDEL CREEK MINE PN C-82-056 SETTLEMENT AGREEMENT NOVS C-93-078 & C-93-079
From
DMG
To
TWENTYMILE COAL CO
Violation No.
CV1993078
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CYCC objected to the penalty, because they did not feel the NOV <br />was intentionally caused. The site conditions have been very <br />unpredictable this spring. Some days it had been very wet, <br />obviously making it difficult to get around. Other days were dry <br />and access was possible. Some days conditions appeared dry, but <br />once out in the field, it was wetter than it appeared. The <br />personnel and contractors that caused these NOV's were <br />experienced at the mine, but they misjudged the conditions. They <br />did not intentionally cause the NOV's. <br />Based on the information presented, i see no evidence to indicate <br />the NOV's were intentional. I am reducing this to $500.00 <br />representing mid-level negligence. <br />Good Faith <br />The NOV was written on a Friday afternoon. On Saturday the <br />operator brought in a crew of three people to hand rake and seed <br />the disturbance at Pond B. At Pond T, the operator abated the NOV <br />by July 13. This was the shortest time possible given the wet <br />conditions in the area. If the NOV were abated sooner greater <br />harm could have been done. <br />I believe the NOV was abated in the shortest time possible. An <br />extraordinary effort was undertaken at Pond B to abate the NOV <br />the next day. I propose a $250.00 reduction for good faith. <br />Settlement Agreement Penalty Proposed $800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.