Laserfiche WebLink
<br />-3- <br />Table RP-1 <br />ctivity ota <br />Backfilling <br />Portal Bench 6,000 <br />Tractor .70 4,200 <br />Front-end Loader .48* 2,880* <br />7,080* <br />Access Roads 4,500 <br />Tractor .35 1,575 <br />Front-end Loader .48* 2,160* <br /> 3,735* <br />Sediment Ponds 8,400 <br />Scraper 2.34* 19,656* <br />Tractor .35 2,940 <br /> 22,596* <br />Truck Scale Area <br />Tractor 400 <br /> 90 <br />Grader 688* <br />TTT$* <br />Overburden Packing <br />Tractor 555 <br />Front-end Loader 280* <br />835* <br />SPGM Salvage (dam) 1,800 <br />Tractor 35 630 <br />Scraper 2.34* 4, 212* <br /> $4, 842* <br />SPGM Replacement (includes topsoil) 2,700 <br />Scraper 2.34* 6, 318* <br />Front-end Loader (see backfilling) -- ---- <br /> 6, 318 <br />Soil Preparation 33,066 <br />Tractor .15* 5, 092* <br />Grader (see truck scale area) ----- <br />5,092 <br />