My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26223
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:15 PM
Creation date
11/21/2007 11:14:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983148
IBM Index Class Name
Enforcement
Doc Name
UNPERMITTED CONSTRUCTION MATERIAL EXTRACTION OR EXPLORATION OPERATION PRESENTATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ . <br />• _2_ <br />CIVIL PENALTY (C.R.S. 3432.5-123) <br />Require the operator and/or landowner to pay a minimum civil penalty in the amount of <br />$432.90, based on 13 hours of staff time at $33.30/hour. <br />2. If the Board finds the operation to be an illegal Construction Material Extraction Operation, the <br />Board should also assess the operator and/or landowner a civil penalty of not less than $1,000.00 <br />per day nor more than $5,000.00 per day for each day the land has been affected, not to exceed <br />365 days. <br />a. In this case, the Office recommends that the Board find 6 days of violation at <br />$1000.00 per day. <br />b. The total civil penalty is $6,432.90 (Nos. 1 & 2), of which $432.90 is due 30 days <br />from the date of the signed Board Order. <br />c. The Office recommends that $6,000.00 of the total civil penalty be suspended, if <br />the recommended corrective action is completed by the required date. If the <br />corrective action is not completed by the required date, the remaining $6,000.00 <br />becomes due on July 26, 1996. <br />M:bSSVmmWFOrml.hs <br />
The URL can be used to link to this page
Your browser does not support the video tag.