Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />E~~A <br />S Coal Company <br />Seneca Coal Company <br />July 7, 1995 <br />Ms. Erica Crosby R~CFIV~CD <br />Division of Minerals and Geology ,/ <br />1313 Sherman Street, Room 215 U( 11995 <br />REnveSeneca$II03Permit C-80-005, NOV No. C 195n0 4mera/s&Geo/p9Y <br />Dear Ms. Crosby: <br />This correspondence is a request for an extension of time for Step <br />1 of the remedial action necessary to abate this violation. This <br />action required that the topsoil stockpiled be removed from the <br />disturbed area and revegetated according to the requirements in the <br />permit. Ground conditions are drying out, work has started on <br />hauling and redistributing the topsoil, but some areas are still <br />wet and the work will not be completed by the end of today. <br />Therefore, a two week extension would set a new deadline date of <br />Friday, July 21th. <br />Please contact me if you or any other members of the Division have <br />any questions regarding this request. <br />Sincerely, <br />~(~.Q ~f. a-~- <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt(PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />