Laserfiche WebLink
4. I therefore issued NOV C-2005-001 from our Denver office on Tuesday, 2/1/05. I issued <br />the NOV for "Failure to construct and/or maintain the embankment for Sediment Pond B <br />as necessary to ensure the integrity and stability of the pond embankment." Rules cited <br />were 4.05.6(2) and 4.05.9(6). I required the pond be repaired and a certified inspection <br />report be provided to DMG by Tuesday, 2/22/05 (a three-week abatement period). <br />5. On Wednesday, 2/16/05, Jim Stover submitted an inspection report certifying that the pond <br />repairs were complete. On Thursday, 2/17/05, Wally Erickson inspected the site and <br />verified that the repairs were completed (I expect his inspection report some time today). <br />Wally informed me of this on Friday, 2/18/05. <br />6. I therefore terminated the NOV as of Thursday, 2/17/05, the date Wally verified that the <br />pond repairs were complete. Please note that the 2(17(05 termination date is five days <br />ahead of the 2/22/05 abatement date set forth in the NOV. <br />