Laserfiche WebLink
iii-ii-iiiii-iuiii , • <br />STATE OF COLORADO <br />Rpm; DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 <br />DIVISION OF <br />Denver, Colorado 80203 <br />Phone: 130318663567 _ MINERAL S <br />FAX: (303) 832-8106 ~~^ r *~ ~ yn l~ f I WC ~~.~ & <br />f 1 t`~A E~ 1. cEOLOGv <br />RECLAMATION <br />MI NING•SAFETY <br />November 22, 1999 '~ Rau o.,-e~, <br />Go,-ernor <br />Greg E. Walther <br />Mr. Kurt Nielsen / Execubvc Ducclo~ <br />j o: American Soda, L.L.P. / ~,,~hael s. Eons <br />c/o Steigers Corporation Drv~s~on Dueaor <br />6551 S. Revere Parkway, Suite 250 <br />Englewood, CO 801 1 1-64 1 l <br />RE: Reclamation Bond, Yankee Gulch Minerals Project, Permit No. M-99-002 <br />Dear Mr. Nielsen: <br />The Division of Minerals and Geology (DMG) has completed a review of the interim bonding <br />proposal provided in a FAX dated November 16, 1999. The proposed bond in the amount of <br />$2,603,000.00, when added to the $26,000.00 curcently held by DMG and the bond for the test <br />mine facilities curcently held by the Bureau of Land Management (BLM), is adequate to cover <br />reclamation costs for all surface disturbance approved through the 0-5 year mining panel. Upon <br />posting and acceptance of the $2,603,000.00 bond American Soda would be approved under the <br />reclamation permit issued by the Mined Land Reclamation Board (MLRB) to proceed with <br />construction of surface facilities. Additional bond must be provided prior to drilling any of the <br />production wells. <br />The following caveats apply to DMG's acceptance of the proposed $2,603,000.00 bond amount: <br />L It is DMG's understanding that the interim bond will be posted with the BLM. Posting the <br />bond with a federal land manager is acceptable under Rule 4.2.1(8) of the MLRB regulations. <br />However, also in accordance with Rttle 4.2.1(8), American Soda must provide documentation <br />to the DMG that the bond has been posted with and accepted by BLM. American Soda must <br />also provide a written permit commiunent stating that a replacement warranty sufficient to <br />cover the cost of remaining reclamation liability will be posted with the MLRB prior to any <br />reduction or release of the bond held by the federal land manager unless the DMG has issued a <br />written concurrence with [he bond reduction or release. <br />2. It is DMG's understanding that BLM will require that reclamation cost line items for post- <br />closure ground water and subsidence monitoring, for test mine facility reclamation, and for the <br />BLM's lease bond be included in addition to the $2,603,000.00 interim bond amount. The <br />DMG has no objection to these cost items being included in the bond to be provided. <br />