Laserfiche WebLink
- • i <br />v, ~ <br />Larry Oehler - 2 - ,dune 20, 1990 <br />suggests that internal drainage facilities be built into the homo enous <br />embankment. Specific internal drainage design criteria should be submitted to <br />the Division for approval prior to construction. Both of these c ncerns <br />should be addressed when the stability analysis is submitted. <br />Reclamation Resources Inc. has not provided sufficient informatio to the <br />Division demonstrating the stability of the pond embankment. As he <br />embankment may be considered a critical structure at this site, s ipulation <br />addressing its stability are inappropriate. Therefore, it is not possible at <br />this time to make the finding required by C.R.S. 34-32-115 that t e operation <br />will be in compliance with the performance standards of 34-32-116 Given the <br />constraints of pre-hearing order, I would recommend denial of the amendment, <br />barring its withdrawal or continuance. <br />cc: Bruce Humphries <br />SGR/yjb <br />8163E <br />