Laserfiche WebLink
- ~~~ <br />• • <br />Dave Shelton -2- March 8, 1982 <br />History of Previous Violations = $ 150.00 <br />Seriousness 8I-43 = $1,312.50 <br />81-94 = $ 218.75 <br />Fault = $ 250.00 <br />TOTAL $1,931.25 <br />W.A.C. concluded their arguments for reduction by stating that "it is significant <br />that proper communications regarding the event of installing a new fan and <br />sealing the opening at the old mine were made with MLR'.', and that as such their <br />proposed Zevel of assessment ($618.75) is fair. This is simply not true. One <br />of the reasons for writing the N.O. V. 's was to point out to the operator that <br />if proper communications had been made with MLRD prior to conducting the <br />activity, the work would have been conducted in a proper manner and no N.O. V.'s <br />would have been written. This Iack of proper communication can be documented <br />in the Division's files. This being the case, 1 feel that $1,932.25 is a <br />fair assessment. <br />/mt <br />