Laserfiche WebLink
~~~ uo yl rx! 0414 PM 11CC/WEST ELK MtHE FAX N0. 9709295595 P, pp <br />west Elk Mira <br />parameters are measured (~at~le-'i•`r~j~'~i~ and the water sample is filtered, divided into the <br />proper sample bottles, sealed, coaled as appropriate, boxed, and delivered to the laboratory for <br />analysis. In some cases, samples may not be available since there is insufficient water for <br />sampling. 'T'his means that there is not enough water to fill the sample bottles and an additional <br />~ 300 to 500 ml of sample for rinsiag and field parameter measurement. <br /> <br />Monitoring Mining Impacts-Surface Water <br />Monitoring of surface water to assess potential impacts of B-Seam mining will continue. No <br />changes were made to the plan when mining was begun in the B-Seam, as the original B-Seam <br />mining azea is essentially the same as the original F-Seam 5-year permit area. The existing <br />monitoring plan can be found in the Surface and Grotwdwa[er Monitoring Section. A technical <br />revision to reduce hydrology monitoring was submitted in April. 1987 and was subsequently <br />approved. Monitoring of surface water data for the water augmentation plan will continue, as <br />will other surface water monitoring. <br />~. Z.t)5-$0 6/9S PR06: 1!196 MF101 ~ PR07R: RevucE De<. 1997MFIQ4 <br />,. , r..~....:::,..,....._ ,,...., <br />.._ <br />a .. _ sw~ <br />