11/21/2007 11:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/30/2002
Doc Name
Bond Release Application (Letter to Tab 7)
From
J.E. Stover & Associates
To
DMG
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mr. Dan Mathews - 3 - December 23, 2002 <br />17. A description of the results achieved: <br />• All of the mine portals have been sealed. <br />• The Roadside North Portal, North Decline and Northwest Intake Portal have been <br />restored to approximate original contours. <br />• Approximately 18" of non-toxic cover was placed on the Cameo Refuse Disposal <br />Area No. 1. <br />• Approximately 24" of non-toxic cover was placed on the Cameo Refuse Disposal <br />Area No. 2. <br />• Cover material for Cameo Refuse Disposal Area No. 2 was removed from Cameo <br />Borrow Area No. 1 and then topsoil was replaced on the borrow area. <br />• Cover material for Cameo Refuse Disposal Area No. 2 was removed from the <br />re-chaanelized section of Coal Creek. Drop structures were removed from this <br />section of the channel. <br />• The Roadside Refuse Pile was reshaped to provide two 10 - 15 foot wide benches <br />at approximately 30 - 40 foot vertical increments. The pile was then covered with <br />18" of non-toxic material on all slopes and benches. <br />• Cover material for the Roadside Refuse Disposal Area was removed from the <br />Roadside Refuse Borrow Area. Topsoil was replaced on the borrow azea afrer <br />• regrading to approved final contours. <br />Anew upper diversion ditch system was constructed at the Roadside South Portal. <br />The old upper diversion ditch was restored to approximate original contours. <br />• Anew upper diversion ditch system was constructed for the Cameo Refuse <br />Disposal Area No. 2 and the old upper diversion ditch was restored to <br />approximate original contours. <br />• Rock groupings were placed on the refuse piles during the 2002 reclamation <br />project. <br />• The concrete/CMP dip section on Haul Road No. 2 was reclaimed. <br />• With the exception of "G" substation and the associated powerlines, all structures <br />and miscellaneous materials were removed from the Roadside North Portal site. <br />This includes all buildings, materials, impoundment ponds, and drainage <br />structures such as culverts, drop boxes and pipes. Miscellaneous materials <br />include all derelict mining machinery, parts, coal handling facilities, coal pads and <br />road surfaces. <br />• The overland conveyor system, transfer towers 1, 3 and 4, the lineaz stacker and <br />terminal building have been removed from the overland conveyor corridor. <br />• The prepazation plant, the clarification tank, the refuse truck loading facility and <br />compressor buildings have been removed at the Roadside South Portal. <br />• The Stacker tube and all conveyor structure at the Roadside South Portal have <br />been removed. <br />• Substation B and all associated powerline and poles on the mesa above the <br />• Roadside South Portal have been removed. <br />