My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV16115
DRMS
>
Back File Migration
>
Revision
>
REV16115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:30 AM
Creation date
11/21/2007 11:11:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
5/26/1992
Doc Name
SOMERSET MINING CO APPLICATION FOR A MINOR REVISION INCREMENTAL BONDING PN C-81-022
From
J E STOVER & ASSOCIATES
To
MLRD
Type & Sequence
MR11
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J . E . STOVER & ASSOCIATES III IIIIIIIIIIIII III <br />2768 COMPASS DRIVE, SUITE 101 999 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAR 242-7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONSTRUCTION MANAGEMENT <br />Ma~j~~`! ~~~ <br />S. S. Shuey ~~99 Y <br />Mined Land Reclamation Division 7AY 2 G 19g~ <br />1313 Sherman St., Room 215 Mln <br />Denver, CO 80203 edLan <br />Re: Somerset Mining Company '~ <br />Application for a Minor Revision - Incremental Bonding <br />Permit C-81-022 <br />Dear Mr. Shuey: <br />The technical revision for the coal stockpile areas provided <br />for a reclamation bond for two new coal stockpile areas, a revised <br />sediment control system, a coal sampling system and a loadout weigh <br />system. Somerset has decided to delay the construction of the Elk <br />Creek coal stockpile area and the loadout weigh system. Because it <br />may be a year of longer before these facilities are constructed the <br />$105,000 reclamation bond for the coal stockpile areas has been <br />allocated as follows to provide for incremental bonding: <br />East Yard Coal Stockpile, <br />Sedimentation Control & Sampling System $ 37,000 <br />Elk Creek Coal Stockpile $ 50,000 <br />Loadout Weigh System S 18.000 <br />TOTAL $105,000 <br />The details of this breakdown are shown on pages E-3, E-4, E-5 <br />and 23.05-38iv. Somerset requests that the increase in the <br />reclamation bond for the east yard coal stockpile area, the <br />sampling system and the sedimentation control system be approved at <br />$37,000. Prior to initiation of any disturbance associated with <br />the Elk Creek coal stockpile or the loadout weigh system, the <br />reclamation bond will be increased by $50,000 and $18,000 <br />respectively. <br />Please call if you have any questions. <br />Sincerely, <br />,~:~_~/~ <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: Basil Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.