Laserfiche WebLink
West Fuels-Utah, Inc. Desera~ Mine <br />Quarterly~ediment Pond P.E. Inspection Report <br />. Date of Inspection: 12/16/93 to l2/t7/93 Inspector: Tim Chervick -- Environmental Coordinator <br />Operational Status <br /> <br /># Type of <br />Ponds <br />Name Approx <br />H2O Level % Sediment <br />Level °h <br />Outflow <br />Comments <br />1 Sed Ponds DP-1 95 5 N.D. <br />2 RP-I 0 1 N.D. <br />3 RP-2 3 20 2 N.D. <br />4 RP-4 10 I N.D. <br />5 RR-1 0 5 N.D. <br />6 RR-2 0 5 N.D. <br />7 RR-3 0 5 N.D. <br />8 SS-1 70 10 N.D. <br />9 SS-2 0 0 N.D. <br />10 HSL-1 0 1 N.D. <br />I1 SDH-2U 0 2 N.D. <br />12 SDH-2L 2 4 N.D. <br />l3 SDH-3 90 1 N.D. <br />14 EP-l U 2 N.D. <br />15 Sums RRS-l 10 3 N.D. <br />16 TS-1 5 5 N. D. <br />17 TS-2 S 5 N.D. <br />18 EP-2 0 0 N.D. <br />19 EP-3 0 0 N.D. <br />20 EP-4 0 0 N.D. <br />21 Proc Pond PP-I 80 15 N.D. <br />22 PP-2 50 1 N.D. <br />23 La oon AL-1 90 Unknown N.D. <br />Pond Descri lions <br /> <br /># Type of <br />Ponds <br />Name <br />Descri lion <br />1 Sed Ponds DP-l D-Portal <br />2 RP-1 Refuse Area 1 <br />3 RP-2 3 Refuse Area 2/3 <br />4 RP-4 Refuse Area 4 <br />5 RR-I Railroad FiII Slo Pond 1 <br />6 RR-2 Railroad Fill Slo Pond 2 <br />7 RR-3 Railroad Loo Pond <br />8 SS-1 Slot Story a Buildin Access Road Pond <br />9 SS-2 Slot Story a Buildin Eme en Coal Story a Area Pond <br />]0 HSL-1 Halandras Sari Land Fill Pond <br />11 SDH-2U Down Hole Sum U r Influent Pond <br />12 " SDH-2L Down Hole Sum Lower Effluent Pond <br />13 SDH-3 Down Hole Sum Dischar e 2 <br />14 EP-1 Easl Portal <br />IS Sums RRS-1 Railroad S 1 <br />16 TS-1 Transfer Buildin 1 <br />17 TS-2 Transfer Buildin 2 <br />I S EP-2 East La down Pad <br />19 EP-3 West down Pad <br />20 EP-4 Turnaround Pad <br />21 Proc Pond PP-1 Pr Plant Proccess Pond <br />22 PP-2 Pre Plant Process Pond <br />23 AL-1 Alluvial Raw Water La oon <br />OperAl 22-Deo-93 <br />