My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV16112
DRMS
>
Back File Migration
>
Revision
>
REV16112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:30 AM
Creation date
11/21/2007 11:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
4/7/1995
Doc Name
PN C-82-056 TR95-20 BATCH WEIGH LOADOUT SYSTEM ADEQUACY RESPONSES
From
TWENTYMILE COAL CO
To
DMG
Type & Sequence
TR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ y~ '~'W6NTYM16E <br />C COAT. COMPANY <br />A Cyprus Amax Company <br /> <br />Twentymile Coal Corporation <br />29515 Routt County Road # 27 <br />Oak Creek, Colorado 80467 <br />303-879-3800 <br />^~FIVED <br />April 6, 1995 <br />~'^'K <br />~ ~ 1995 <br />Liv . <br />"' „"~~erals&GeolobY <br />Mr. Kent Gorham <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. Colorado 80203 <br />RE: PERMIT C-82-058; TECHNICAL REVISION 95-20; BATCH WEIGH LOADOUT <br />SYSTEM: ADEQUACY RESPONSES <br />Dear Mr. Gorham: <br />In response to adequacy issues raised in your letter of March 21, Twentymile Coal Company <br />(TCC) provides the following information for your review. Adequacy item responses are <br />presented in the order comments were revised permit materials are included in this submittal as <br />necessary. <br />Comment 1.) As we discussed with regard to water diversion for the coal waste pile, ditch D-1 <br />may be used with regard to the waste pile diversion and will need to be sized for the 100yr, <br />24hr rainfall event in that circumstance...... <br />Response 1.) Ditch D-1 as presented under TR-20 will not be utilized as part of the waste pile <br />diversion. TR-21 to be submitted shortly details the waste pile diversion design which includes <br />the establishment of a 100-year, 24-hour diversion above the proposed construction site of the <br />batch weigh loadout system coal stockpile. <br />Comment 2.) Have the proper changes been made or contemplated with regard to the NPDES <br />permit and Pond C receiving, and possibly discharging, wash down water from the batch weigh <br />system? <br />Response 2.) Mr. Jon Kubic with CDPHE has been contacted with regard to the potential need <br />to modify the NPDES permit applicable to Pond C. TCC does not believe a modification of this <br />nature is warranted given the negligible quantities of water anticipated to be generated from the <br />wash down process, the historical "dry' pattern typically exhibited by the pond, and the fact that <br />wash down water from the batch weigh loadout facility will be essentially identical to runoff <br />water normally conveyed to Pond C from the Tipple 2 coal stockpile area. <br />Comment 3.) The two sumps and the temporary diversions are not shown on Map 24. <br />
The URL can be used to link to this page
Your browser does not support the video tag.