Laserfiche WebLink
-r..~ <br />-3- <br /> <br />10. Primary future _ Cropland(CR) x Pastureland(PL) _ General Agriculture(GA) <br /> (Post-mining) x Rangeland(RL) _ Forestry(FR) Wildlife Habitat(WL) <br />~ <br /> land use Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br />11. Primary resent CroplandCCR) g Pastureland(PL) _ General Agriculture(GA) <br /> land use y RangelandCRL) _ Forestry(FR) _ Wildlife Habitat(WL) <br /> (check one): Residential(RS) Recreation(RC) _ Industriai/Commercial(IC) <br /> _ Developed Water Resources(WR) <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> _Bulldozer and Loader <br />13. On Site Processing: Solution (SO) Chemic al (CH) _ Thermal (TH> <br /> _ Heap Leach (HL) _ Vat Le ach (VL) <br />14. AppliCdtion Fee: <br /> The application fee for Quarry mining is $2,325. <br /> The application fee for Solution mining or any Chemical o r Thermal Processing <br /> is $3,1c)0. <br />If none of these methods or processes are to be included in the operation then the <br />applica~:ion fee is $1,875. <br />The application fee for conversion to a 112 permit is $1,500. <br />112 Amendment application fee is $1,550. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must tie made within 120 calendar days from the date the application was <br />submitted. Flowever, the performance and financial warranties must be approved by the <br />Division or E~oard before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT I5 ISSUED (Rule 7.2(2)). <br />It shall be a. provision of this permit that the operations will be conducted 1n <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />