Laserfiche WebLink
/~~~,o~ <br />v ~~fe s : ~ov-~ ^ ~ lf~.~v-a~,~aX ° ~ ~o ss~ b~e viol (~c~..~ <br />CONSTRUCTION MATERIALS EXTRACTION <br />OR EXPLORATION OPERATION <br />Presentation Form <br />GENERAL INFORMATION <br />htspection Date: Not applicable <br />File No.: M-1987-028 <br />Permittee: Colorado Marble, L.L.C. <br />Operator: Same <br />Existing Bond: $282,000.00 <br />Method of Mining: Surface <br />Permit Type: 1 l Oc <br />Permitted Acres: 9 acres <br />Commodity: Marble <br />County: Chaffee <br />Adequate?: YES <br />Specialist: Carl Mount <br />REASON FOR HEARING <br />'fYawt i2~ZOOY~ 1 <br />Actions taken by the Division and Colorado Marble, L.L.C. since original issuance of Notices of Violation <br />MV-2005-009, MV-2005-010, and MV-2005-011 may have made the continued Possible Violation that is the subject <br />of this hearing not necessary, This possible violation hearing has been continued since the December 15, 2004 Board <br />Hearing. <br />HISTORY OF BOARD ACTIONS <br />December 15, 2004 -Violations found and Boazd Orders issued: <br />• MV-2005-009 for mining outside the permit area; corrective actions included: <br />o Cease mining and reclamation operations outside the permitted azea until obtaining 112 approval <br />0 112 approval must be obtained within 180 days of mailing date of the Board Order <br />o Civil Penalties of $50,000.00 with all but $10,000.00 suspended upon timely completion of actions <br />• MV-2005-010 for failure to minimize hydrologic balance disturbance; corrective actions included: <br />o Design and construct sediment containment structure and drainage channel for Taylor Gulch <br />o Designs must be included in the 112 application <br />o Designs must be approved within 180 days of mailing date of the Boazd Order <br />o Civil Penalties of $5,000.00 with all but $1,000.00 suspended upon timely completion of actions <br />• MV-2005-011 for failure to salvage and properly store topsoil; corrective actions included: <br />o Cease failing to salvage topsoil and segregate all topsoil that may still exist on site and properly store such <br />o Include topsoil salvage plans and alternative source in the 112 application <br />o Get 112 approval within 180 days of the mailing date of the Boazd Order <br />o Civil Penalties of $1,000.00 with all but $100.00 suspended upon timely completion of actions <br />• Possible Violation for failure to follow the approved mining and reclamation plan continued for 180 days <br />June 9 and 13, 2005: <br />Operator submits temporary sediment control plan on June 9, 2005 <br />Division reviews plan and suggests changes <br />Operator submits changes to temporary sediment control plan on June 13, 2005 <br />