My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV16058
DRMS
>
Back File Migration
>
Revision
>
REV16058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:27 AM
Creation date
11/21/2007 11:11:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Revision
Doc Date
5/16/1989
Doc Name
MR 89-37 TEMPORARY DIVERSIO DITCH TO POND 3 MINE 1 2 & ECKMAN PARK PN C-81-071
From
CYPRUS YAMPA VALLEY COAL CORP
To
MLRD
Type & Sequence
MR37
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ' ~ ~ ~ III III III III I'll III <br />~g Cyprus Yampa Valley Coal Corporation <br />M Alldiera of Cypus Mrnenls Camgny <br />t4ay 10, 1989 <br />2y,,B7 Routl Coumy Roatl s27 <br />Oek Geek, CO B0e67 <br />Prwne (303) 8793800 <br />~F~.~, _ <br />y TG] V . <br />` -1 <br />/.~ <br />~~:~I`" I ,~, <br />t. ~__~~ <br />P1r. David Berry <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 50203-2273 <br />R ti.::; <br />FL'f /a~~6:~71.~~.~~'~~'~: <br />~. :,..: n <br />r,~ <br />Dear Mr. Berry: <br />Minor Revision 89-37: T <br />Diversion Ditch to Pond E, Mine <br />Colorado Yampa Coal Company (CYCC) is submitting the following <br />information to complete the requirements of the field approved minor <br />revision 89-37. Minor revision 59-37 was approved in the field in order to <br />allow CYCC to temporarily reroute the bar ditch which ran along the south <br />side of haul road C then into Pond E. The ditch will be rerouted across the <br />road (low water crossing), along the base of the slope which is west of the <br />shop area, then into ditch E-1 (see Figure MR 89-37). The rerouting of the <br />ditch is in response to the construction of the Twentymile Coal Company's <br />(TCC's) new tipple facility. Once the tipple pad construction is complete <br />the ditch will be routed back around the TCC tipple pad into Pond E. <br />To complete this project, CYCC has also shown the proposed permanent <br />location of Ditch D-5 (TCC Technical Revision 89-08, C-82-056) which will <br />route water around the south side of the TCC tipple facility to Pond E and <br />render the temporary ditch obsolete. <br />Attached is Figure MR 89-37, "Temporary Diversion Ditch & Proposed <br />Ditch D-5" showing the location of the ditches. <br />If there are any questions, please feel free to call me. <br />Sincerely, <br />Rich d~Hughe <br />Environmental Specialist <br />Enclosures <br />RH/dg <br />c~RUs <br />
The URL can be used to link to this page
Your browser does not support the video tag.