Laserfiche WebLink
<br />~, <br />~ EXHIBIT L -Reclamation Costs (Revision 2, May 200~t *~ ~-~v '""~ <br />Revised for Technical Revision February 2007 /~ <br />1 `Z~OI <br />or,,rr:n., _.4. <br />The following information pertains to the Colorado Division of Minerals ,ands. yandogyation, <br />Permit # 1974-069, Larimer Pits, Amendment No. 3, for Loveland Ready Mix ~l:oncrete;~Y <br />Inc. <br />The estimated reclamation costs have been revised to reflect DMG comments. As <br />detailed in Exhibit E, Reclamation Plan, most areas will be planted with grass seed. None <br />of the areas have been targeted for planting either trees or shrubs. <br />This estimate was further revised in February 2007 to reflect the proposed changes <br />to Cell #8 based on the Technical Revision. The Technical Revision modifies the cell <br />from a pond to a prairie meadow. This will increase the required topsoil <br />application, final gradinglcontouring, and grass seeding for this cell. <br />Cells 1 thru 3 $ 00 <br />Storage Pond #1 (Cells 4 and 5) $ 00 <br />Storage Pond #2: (Cells 6 and 7) This includes total costs for spreading topsoil down to <br />waterline and seeding. <br />Final Grade: 2 ac $500 $ 1,000 <br />Topsoil: 1,400 cy $ .50 $ 700 <br />Grass Seeding: 2 ac $500 1 000 <br />$ 2,700 <br />Cell 9: Cell 9 has been mined and backfilled, topsoil is graded and seeding will <br />commence in the spring 2006. <br />Topsoil Application: 6 cy $ .00 <br />Final Grading/Contouring: 6 ac $ .00 <br />Grass Seeding: 6 ac $500 3 000 <br />$ 3,000 <br />Revised Reclamation of Cell 8: The revised reclamation of cell 8 will occur <br />concurrently with the mining of the cell. The drainage ditches will be installed as <br />part of the mining operations for dewatering of the cell. At any one time we will <br />have approximately 1000 feet of pit wall to backf-ll, slope, and reclaim. The fina- <br />reclamations will include approximately 5 acres of side slope and 13 acres of cell <br />bottom for an approximate total of 18 acres to be reseeded. In total, the costs of <br />backfilling overburden, topsoil application, and reseeding are estimated as follows: <br />Backfill Overburden: 72,277 cy $ 0.50 $36,140.00 <br />Topsoil Application: 14,500 cy $ 0.50 $ 7,250.00 <br />Final Grading/Contouring: 18 ac $500.00 $ 9,000.00 <br />Grass Seeding: 18 ac $500.00 9$ ,000.00 <br />$61,390.00 <br />Less Original Estimate For Cell #8 (Amendment 2) $43,010.00 <br />Net Additional Cost = $18,380.00 <br />