Laserfiche WebLink
EXHIBIT L -Reclamation Costs (Revision 2. Ma, 2~ 006) <br />Revised for Technical Revision February 2007 <br />Storage Ponds 1 and 2; Install 18 inch transfer pipe and slide gate. <br />18 inch RCP pipe: I50 LF <br />18 inch RCP, 18 degree: 2 ea <br />18 inch RCP slide gate: 1 ea <br />Install pipe: 150 LF <br />Install slide gate: 1 ea <br />$18.50 $ 2,775 <br />$ 100 $ 200 <br />$2,500 $ 2,500 <br />$ 20 $ 3,000 <br />$ 200 Z00 <br />$ 8,675 <br />TOTAL RECLAMATION COST: <br />TECHNICAL REVISION ADDITIONAL COST <br />TOTAL REVISED COST: <br />$170,915 <br />$18,380 <br />$189,295 <br />Page 3 of 3 <br />