Laserfiche WebLink
C-81-044: TR-17 E. Crosbv 3 <br />7. Exhibits 52 and 53 show topsoil pile 12A located alongside the drainage at CBA #2. <br />Has the operator insured that this pile will be sufficiently protected from runoff <br />events coming down the drainage? This may be a question already asked by the <br />Surface Water Hydrologist. <br />8. In accordance with Rule 4.06.2(1) the operator should define if vegetation will be <br />removed prior to topsoil salvage or will it be incorporated into the salvaged soil? <br />I believe this covers all my concerns. Some answers I have in regards to Larry Routten's <br />February 18, 1994 memo: <br />Concrete building at CBA #1. In September while I was conducting an inspection at <br />Roadside, Larry Reschke said they would doze it. This probably should be stated in the <br />revision somewhere. I think he intended to bury the cement at the refuse area. <br />Pond 11 has already received permitting and NPDES # from CDOH. <br />If you need me to explain anything further, just ask. <br />m:\coal\j hb\c81041tr.17 <br />~,cc: Public File C-81-041 <br />