Laserfiche WebLink
' ~' ~' <br />Mr. Jim Dillie <br />Mr. Bob Oswald <br />August 2, 1994 <br />Page 2 <br />the Committee whole heartedly endorses the mining and reclamation <br />concepts described in the proposed Amendments. <br />Castle describes, in both of the Amendments, the efforts of <br />the community and the Committee to develop with Castle plans for <br />enhanced reclamation at the two quarries. These efforts resulted <br />in the p.lar.s for en::a::ceci r.~=_clar.:atiar. i:h=~ are irclui?ed in the <br />proposed Amendments. The MRAC/Castle negotiations were premised <br />on the existing mining plans. One of the Committee's <br />frustrations was that the mining plans were designed only to <br />maximize recovery of aggregate, with little regard to reclamation <br />or the visual impact of mining operations. The Committee was <br />also frustrated with the base reclamation plans that had been <br />adopted in the original permits (1977) and which did not reflect <br />contemporary expectations of the community. Given those <br />constraints, MRAC and Castle developed plans for enhanced <br />reclamation which were intended to take off where the base <br />reclamation plan ended. The enhanced plans were necessarily <br />d the base reclamation <br />d t <br />h <br />i <br />d <br />th <br />t <br />opograp <br />y an <br />prem <br />se <br />on <br />e projec <br />e ~ <br /> <br />requirements. U ` <br />~~ ~ <br />uL <br /> <br />l ~y <br />J.y <br />J <br />an <br />The Amendments now proposed by Castle alter the mining f rl,~/ILU~ <br />.wand will lea <br />~, )~ / the enhanced <br />r the proposed <br />little sense <br />revegetation <br />/e a topography that is different from that on which <br />_reclamation_glans are premis_e_d,lTherefore, given-- <br />mining plans, the enhanced reclamation plans make <br />except to outline the type and intensity of /~k <br />and the rock staining that needs to be implemented. VV <br />The Division needs to understand that the so-called enhanced <br />reclamation plans are merely proposals that have not been funded. <br />There are no guarantees that anv of the enhanced reclamation will <br />be implemented. Castle quite appropriately acknowledges this <br />fact in its Amendments. Therefore, it is essential that the <br />Division evaluate the base line reclamation proposed by Castle <br />with the understanding that Castle will be required to implement <br />only the base reclamation and that the bond will cover only this <br />level of reclamation. The Division must be satisfied that the <br />proposed base reclamation meets the minimum requirements of state <br />law. 1, <br />0 <br /> <br />DCC\99999\98610.1 <br />