Laserfiche WebLink
~ Ms. Semner - 2 - February 16, 1988 <br />The Foidel Creek tdine has had 18 stipulations placed on the approval of the <br />permit or upon successive revisions to the permit. Of these stipulation <br />numbers 1, 2, 4, 6, 7, 8, 12, 15, 14, 16, 17 and 18 have been satisfied and <br />have been terminated. Stipulation Nos. 3, 9, 10, 11, 13 and 15 are on-going <br />requirements and should be inserted into the permit application as <br />commitments. These should be submitted as revised pages as part of the permit <br />renewal. <br />~F~ydrologic Balance - Rules 2.04.5, 2.04.7, 2.05.3(4), 2.05.6(3) and 4.05 <br />a. Please make water rights noted on Map 7 (the Fish Creek Permit) agree <br />with Map 15, Foidel Creek Life-of-Mine permit, per Rule 2.04.7(3). <br />b. Revise Map 5 (Fish Creek) to show elevations of surface water monitoring <br />sites per Rule 2.04.7 (4)(b). <br />c. Submit three copies of the NPDES Permit No. CO-0036684. The Division has <br />no copies of this permit in aqy of the permit application copies nor its <br />files. <br />d. Re-write the solute transport section of the PHC to reflect conditions <br />described in the Foidel Creek Life-of-Mine PHC. <br />Backfilling and grading - Rules 2.05.3(6)(b), 2.05.3(9), 2.05.4(2)(a), <br />2.05.4 (2)(c), 2.09, 4.13 and 4.14 <br />a. The rill and gully stabilization plan should include a schedule for <br />mitigation efforts. This plan should include dates for identification <br />and mapping of gullies, and deadlines for performing the work. <br />If you have any questions, please contact me. <br />Sincerely, ~ ~ <br />~/~ <br />~~( `T~_ <br />Randall P. Price <br />Reclamation Specialist <br />RPP/vjr <br />Enclosure(s) <br />5320E <br />