My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25948
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:05 PM
Creation date
11/21/2007 11:10:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/23/1997
Doc Name
WEST ELK MINE PN C-80-007 NOV NO CV-97-009
From
DMG
To
MOUNTAIN COAL CO
Violation No.
CV1997009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiniiiiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenr of Natural Resources <br />I J 13 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 8663567 <br />FAX: 130]1 832-8106 <br />September 23, 1997 <br />Mr. Phil Schmidt <br />Mountain Coal Company <br />PO Box 591 <br />Somerset, CO 81434 <br />RE: West Elk Mine, Permit No. C-80-007, NOV No. CV-97-009 <br />Dear Mr. Scmidt: <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />FoY Fumer <br />Governor <br />lames S Lochhead <br />E~ecmrve OveUar <br />nnchael B. Lnng <br />Division Director <br />I am in receipt of your request for extension of abatement deadline for NOV No. CV-97-009. I <br />have requested that Michael Long, Director of DMG, approve an extension of the abatement <br />deadline, due to the following reasons. <br />Mountain Coal Company is in the process of monitoring the slide mass which resulted in the <br />issuance of the NOV to determine the nature and extent of the instability. In addition, vazious <br />options for ultimate repair and rehabilitation of the area subject to the instability aze being <br />evaluated by MCC and it's consultants. This work has progressed slowly and deliberately. As a <br />result MCC is not yet prepazed to implement final operational or reclamation plans. Therefore, <br />additional time for abatement is necessary. <br />I propose that a 90 day extension, beyond the initial NOV abatement date, be granted. This <br />would set a new abatement date of December 22, 1997 for both of the abatement steps. <br />Please feel free to call if you have any questions. <br />Sincerely, <br />Susan McCannon <br />Coal Program Supervisor <br />attachment: Extension of time for abatement notice <br />cc: Michael Boulay <br />David Berry <br />
The URL can be used to link to this page
Your browser does not support the video tag.