Laserfiche WebLink
<br />Removal of scale and scale building, including removal and burial of concrete on sit.; and <br />removal of scale house ..............................................................................................$2000.00 <br />Removal of upper half of haul road will be performed during mining of lower reaches of granite <br />deposit and should not be included in reclamation cost for bonding purposes. Final reclamation <br />of roadway will be limited to asphalt removal and regrading to allow for suitable access to <br />reclaim area ......................estimated cost....................................................................$]000.00 <br />Removal cost of non-roadable mining equipment and other scrap will basically cash ~~ut value <br />for expense of loading and haulage, estimated cost for loading and transport............$~000.00 <br />Hopefully, this coorespondence will address each concern expressed in the Division'> second <br />adequacy review dated December 26, 1996. This document with all supporting information, <br />coorespondence, maps, and drawings will be sent by certified mail to Division office, and a <br />copy placed on file at the Fremont County Clerks Office. Please call if you have any questions <br />concerning this coorespondence. <br />V ryes `~ <br />S <br />Kenneth S. Klco <br />Consulting Geologist <br />Azurite, Inc. <br />