Laserfiche WebLink
c~5 <br />r mc~, <br />~~~63 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER .~ <br />Division of Water Resources ~' <br />Department of Natural Resources d~ <br />1313 Sherman Street, Room 818 k • <br />+ <br />• <br />Denier, Cobrado 80203 • tale • <br />Phone (303) 888-3581 <br />FAX (303) 8663599 Bill Owem <br />NNN: WdteRNdIe.CO.US .~ C.aemw <br />Response to Reclamation Permit Application Consideration Diregor <br />/ <br />vbgTE: July 12, 2006 ~ °r~„~r . Pr. <br />O: Richard M. Wenzel, Environmental Protection Specialist <br />CC: Division 1 Office, DisVict 3 Water Commissioner <br />FROM: toana Comaniciu, E.I.T. <br />// <br />, <br />RE: Home Office Mine, File No. M-1977-439 <br />Operator: Lafarge West, Inc. <br />Contact: Eric Reckentine-970-407-3620 or Noel Weisenbacher-303-657-4000 <br />Section 33, Twp 8 North, Rng 69 West, 6th P.M., Lorimer Ccunty <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ®reclamation, <br />® water removed in the mined product, ®processing. <br />Lafarge is seeking to amend its existing 112 permit to reflect the addition of 0.36 acres to the mining <br />plan. Also Lafarge has indicated that the reclamation plan is being revised to allow for approximately <br />11.18 aces silt storage on the western edge of the Home Office Pits. This would reduce the original <br />open water (in area F) from approximately 34.4 acres to 23.22 acres. <br />® A well permit was obtained for the current use and exposed pond surface area of the gravel pit, permit <br />no. 42997-F in accordance with Section 37-90-137(2} and (11), C.R.S. A substitute water supply plan for <br />the site was approved on December 2, 2004 and the plan is currently valid until October 31, 2006. No <br />new well permit is required, however the Applicant must continua to operate under an approved <br />substitute water supply plan or decreed plan for augmentation. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />^ The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the use of the water was decreed for such industrial use. <br />COMMENTS: if stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the sVeam system within 72 hours. This may require a discharge permit from COPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer s Office wifh any questions. <br />