My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25879
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:03 PM
Creation date
11/21/2007 11:09:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Enforcement
Doc Date
1/16/2004
Doc Name
Comments on Violation
From
Holland & Hart
To
DMG
Violation No.
MV2004009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(e) Subject to the requirements of Section 3.2 hereof, payments <br />for additional capacity will be made annually by Buyer <br />commencing on or before December 15, 1999. Between <br />September 30 and November 30 of each year, a <br />determination of the then existing capacity of the pit steal! be <br />made. Until such time as the final engineering design has <br />been completed for the finished water reservoir and <br />necessary permits obtained by Buyer, finally determining the <br />high water level, the elevation of high water level set forth in <br />Section 3.1(d) hereof shall be used for such calculations. <br />Payment shall be made for the additional capacity at the rate <br />of $921.92 per acre-foot, escalated at 6% per year which shall <br />be based on a beginning date of December 15, 1998 as <br />described in Exhibit C attached hereto. Seller shall also keep <br />accurate records of the material excavated from the pit, either <br />in terms of tons across the scale or volume added to the <br />stockpile. Buyer may elect to base any annual payment upon <br />such ton or volume records, which payment shall be <br />calculated based upon 1.50 tons of material per cubic yard. <br />The equivalency of weight to volume is an average and is <br />intended to be used regardless of the composition of the <br />material removed. The annual payment for the period ending <br />December 15, 1999 will be based upon records of removal <br />starting November 15, 1998. If Seller elects, it may, at its own <br />expense, survey the site and calculate the additional capacity. <br />Seller will provide such calculations to Buyer. If the parties <br />are unable to agree as to the additional capacity, they will <br />jointly select a qualified independent third party consultant <br />who will make the binding determination of the then-existing <br />capacity. Buyer and Seller will share the cost of the qualified <br />consultant. <br />(f) Final payment shall be based on an appropriate detailed <br />survey of the final reservoir capacity completed at Buyer's <br />cost on or before December 31, 2006. The operational <br />capacity for the Tina! payment will be based upon the volume <br />of reservoir space below the high water level with 1.875 feet <br />of freeboard, with side slopes completed to the slope required <br />by the mined land reclamation permit. Such survey shall <br />specify the elevation of high water level which was utilized to <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.