My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25863
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25863
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:02 PM
Creation date
11/21/2007 11:08:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
12/12/2000
Doc Name
SENECA II-W MINE PERMIT C-82-057 NOV CV-2000-007
From
SENECA COAL CO
To
DMG
Violation No.
CV2000007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.. <br />DEC 12 '00 03~SBPM PERBOI~ WSTN SENECR MINE <br />c CCJ~.OR~bO ~IVISION OF MINERALS AND GEOLOGY <br />~" ~ ! 3 l3~her~ Street, Room 21 S, Denver, Colo[ado 80203, (303) 866567 <br />SETTLEMT:NT AGREEMENT <br />NOV/CO NO.: CV-2000-007 <br />MQdE; Seneca II-W Mine <br />PERMITNO.; C-1982-057 <br />OPERATOR/PERMITTEE: <br />Seneca Coal Company <br />,ATTENTION: Michael G. Altavilla <br />ADDRESS: P.O. Box 670 <br />Hayden, CO 81639 <br />DATE ISSUED: October 2, 2000 <br />TYPE OF MINE: Surface/Federal <br />COUNTY: Routt <br />P.2 e <br />$ :t <br />The Division of Minerals end Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested s conference thereon, as authorized by C.RS. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on December 4, 2000, the Division and the operator <br />hereby agree as follows: <br />The amount of the penalty shall be $800.00; <br />2, The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties: <br />3. Payment of such penalty.by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten drays after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within tee days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />3433.17_3(8)(a). <br />OPERATOR: ~`~~_ `~ C~r'T~. DATE: <br />By Snuraa a~. Cork.--T--- <br />OF MINERALS AND <br />DATE: /.Z - S ~® <br />Officer <br />sy <br />Division Director <br />~MOL <br />Penalty AQjuapnent Reviewed <br />1Rulc 5.043(4)(c)] <br />CRS 34-33.1:3(Sxc) and (d) <br />Gpv.a cioros~ sei ¢nooim, nor rai.a~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.