My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15733
DRMS
>
Back File Migration
>
Revision
>
REV15733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:06 AM
Creation date
11/21/2007 11:08:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/16/1999
Doc Name
BOWIE 2 MINE TR 09 INCIDENTAL BOUNDARY REVISION FEDERAL RIGHT OF WAY PERMIT C-96-083
From
J E STOVER AND ASSOCIATES
To
DMG
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iiiiiiiininiiiiii <br />J. E. STOVER & ASSOCIATES 999 <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />February 12, 1999 <br />J. J. Dudash <br />Division of Minerals & Geology <br />1313 Sherman St., Room 21 S <br />Denver, CO 80203 <br />RECEIVED <br />FEB 16 1999 <br />Di~nsion of Minerals 8 Geology <br />Re: Bowie No. 2 Mine <br />TR-09 Incidental Boundary Revision <br />Federal Right-of--Way <br />Permit C-96-083 <br />Deaz Mr. Dudash: <br />CIVIL ENGINEERING <br />CONSr. MANAGEMENT <br />On behalf of Bowie Resources Limited, (BRL) enclosed is an application for a technical revision <br />to incorporate Federal right-of--way COC-62688 into the permit boundary and mine plan area. As <br />you know, the right-of--way will not be approved for approximately 60 days. This technical <br />revision application is submitted now in order to allow mining within the right-of--way area as <br />soon as possible after ROW issuance. <br />Project DescriQion <br />This revision will allow BRL to mine the bleeder entries on the east side of the property, extend <br />the North Mains and develop the D2 headgate. This technical revision will not change the method <br />of mining nor will it increase the permitted production. The approved mining technique is <br />conventional room and pillar using continuous miners and shuttle cars with belt haulage. The <br />maximum permitted production is 2.0 million tons per year. <br />Right of Entry <br />By application dated January 26, 1999, the Operator applied for a Federal right-of--way (COC- <br />62688) to develop underground ventilation and access entries (tunnels) which are generally north <br />of the BRL's fee coal. After successful acquisition of the Federal right-of--way and during the <br />current permit term, BRL plans to develop the tunnels into the right-of--way area as shown on the <br />Mine Plan Map -Map 14. There is a strip of Federal coal west of the D2 bleeder entries. This <br />strip of Federal coal will not be mined until a Federal Coal lease is obtained for that area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.