My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-03-13_REVISION - M1974015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974015
>
2000-03-13_REVISION - M1974015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:56:03 AM
Creation date
11/21/2007 11:08:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974015
IBM Index Class Name
Revision
Doc Date
3/13/2000
Doc Name
ADEQUACY REVIEW RESPONSE 2
Type & Sequence
AM6
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />TOP OF BANK ELEVATION = 5222ft. <br />j SCALE, 1' =100' HORIZONTAL <br />1' =10' VERTICAL <br />210' TRENCH <br />W <br />U <br />Q <br />W <br />Of <br />N <br />3 <br />0 <br />Q W <br />3 as <br />a F <br />a <br />O , L <br />at <br />W v <br />f W <br />W M <br />K <br />Z N <br />0 L¢7 <br />GASLINE TO PIPE <br />12 filch a -�' <br />PRECAST INLET BOX <br />r <br />W/ TRASH RACK <br />PIT FLOOR ELEVATION - 5200ft. <br />4 <br />TOP OF BANK ELEVATION = 5222ft. <br />j SCALE, 1' =100' HORIZONTAL <br />1' =10' VERTICAL <br />210' TRENCH <br />W <br />U <br />Q <br />W <br />Of <br />N <br />3 <br />0 <br />Q W <br />3 as <br />a F <br />a <br />O , L <br />at <br />W v <br />f W <br />W M <br />K <br />Z N <br />0 L¢7 <br />GASLINE TO PIPE <br />12 filch a -�' <br />20+ FEET <br />BOTTOM OF DITCH TO PIPE CLEARANCE - 18+ FEET <br />3e In 24 i <br />nch steel casing @ I% Slope <br />HORIZONTAL BORE INSTALLATION O'TRENCH <br />TOP OF BANK ELEVATION = 5216 FT. <br />OUTLET W/ ANIMAL GUARD AND RIPRAP EROSION PROTECTION <br />floor elev.= 5190ft, <br />CROSS- SECTION OF DRAIN PIPE FROM PHASE 1 TO 2 <br />WESTERN MOBILE BOULDER, INC., LYONS PIT <br />CP ENGINEERING <br />7115 DRY CREEK COURT <br />NrMT. COLORADO 80503 BCALM AS NOTED <br />(303)- 552 -2588 <br />DATE: 1/31/001SHT 1 OF 1 <br />Ql <br />c� <br />�n <br />D <br />v <br />n <br />d, <br />CD <br />�- o <br />CD <br />o <br />= <br />r <br />W <br />W <br />a <br />z <br />o <br />J <br />Ww <br />r <br />z <br />Ld <br />OL <br />Li <br />J <br />LL <br />N <br />N <br />W <br />J <br />F <br />G <br />W <br />= <br />0C <br />K <br />J <br />~ <br />U <br />Z <br />p <br />0 <br />t< <br />20+ FEET <br />BOTTOM OF DITCH TO PIPE CLEARANCE - 18+ FEET <br />3e In 24 i <br />nch steel casing @ I% Slope <br />HORIZONTAL BORE INSTALLATION O'TRENCH <br />TOP OF BANK ELEVATION = 5216 FT. <br />OUTLET W/ ANIMAL GUARD AND RIPRAP EROSION PROTECTION <br />floor elev.= 5190ft, <br />CROSS- SECTION OF DRAIN PIPE FROM PHASE 1 TO 2 <br />WESTERN MOBILE BOULDER, INC., LYONS PIT <br />CP ENGINEERING <br />7115 DRY CREEK COURT <br />NrMT. COLORADO 80503 BCALM AS NOTED <br />(303)- 552 -2588 <br />DATE: 1/31/001SHT 1 OF 1 <br />Ql <br />c� <br />�n <br />D <br />v <br />n <br />d, <br />CD <br />�- o <br />CD <br />o <br />
The URL can be used to link to this page
Your browser does not support the video tag.