Laserfiche WebLink
<br />u <br /> <br />Cresson ProjeU <br />ReUemation Coal <br />Area. Phase I, II, III F~rtemel Pond <br />Dewater 8 Remove Slutlge <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />uip. <br /> <br /> <br />ewatering: <br /> <br />Remove Sludge: <br />Hauling Sludge: <br />Truck <br /> <br />Number Unib Production Rates <br /> <br />Gel/min <br />800 <br />CYIHr. AveaMr. <br />45 - <br /> <br />150 - <br />Prod. <br />Rate Houre <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />bor <br />Coat CosVUnil <br /> <br /> <br /> <br />/Aue <br />- <br /> <br />- <br />Equip. <br />Coat Volumes R Aroaa <br /> <br />Gallons <br />20000000 <br />CY Ar•~ea <br />780 - <br /> <br />790 - <br />Material Houdy Total <br />Cosl Coat Coat <br />Datozigcation: Tank 8 Dosing Unit 2.0 - - 8 35.74 - 11901.50 11937.24 95498 <br />Demolition: Tank 8 Dosing Unit 59935 a. Ft. 0.17 10172 <br />Dewatering Flygt BS 2400 1.0 20000000 900 417 24.11 21.83 - 45.74 19058 <br />Remove Sludge: FE Loader 3/4q 1 0 790 45 17 22 68 33.50 58.19 974 <br />Haul Sludge: 7738 1.0 780 150 5 20.41 123.15 - 143.58 718 <br /> 8888 1.0 - - 5 22.68 135.14 - 157.92 799 <br /> 14G Grader 1.0 - - 3 24.10 71.71 - 95.81 297 <br /> Water Trk. 1.0 - - 3 21.07 95.58 - 118 85 350 <br />Foreman Pickup 1.0 - - 189 34.97 11.57 - 46.54 8798 <br /> Total 138842 <br />Detoxification Detail: <br /> Volume 20,000,000 gal <br /> Sodium Cyanide 150 MglLiter ea WAD Sodium Cyanide to .2 mg/Liter as WAD Soaium Cyanide <br /> Molar Ratio 8 to 1 H2O to NeCN <br /> Ibs. NeCN 25014 <br /> Ibs. Moles NeCN 510 <br /> Ibs. Moles H2O3 4084 <br /> Ibs. H2O 138851 100% basis <br /> Ibs. 70%H2O 199359 70%baaia <br /> Cost per Ibs. f0.48 <br /> Cost Peroxide f95,212 <br /> Cost / hr. 11901.0 for B hour <br />v <br />a <br />m <br />