Laserfiche WebLink
Cresson Project <br />Reclamation Cost <br />Area: ADR Building Addition <br />Demolition 8 Disposal <br /> <br />Building <br />Length <br />Width Ave. <br />Height <br />Cu. Ft. <br />E/Cu. Ft. <br />Cost <br />New ADR Building Addition $ICu.Ft. <br />Plant 140.0 43.0 44.2 266,084 0.18 47895 <br />MCC Room 25.0 43.0 28.2 30,315 0.18 5457 <br /> Labor Equip. Hourly <br /> Hours Cost Cost Cost Cost <br />Tanks <br />Enrichment Solution Tank 16.0 81.37 93.91 175.28 2804 <br />Barten Soution Tank 16.0 81.37 93.91 175.28 2804 <br /> Total Demolition 58961 <br />R.S. Means, Building Construction Cost Da[a 1999, pg. 30. <br />• <br />r, <br />L J <br />Page 6 <br />