Laserfiche WebLink
Cresson Prated <br />• <br />Redamaban Cost <br />Area: Plant <br />Demolition 8 Disposal <br /> Ave. <br />Building No Length VWdth Haight Cu.Ft. fICu. Ft. Cost <br /> <br />Pnmary Crushers 2 52.5 32.0 68.0 228.480 0.17 38842 <br />Secondary Crushers 3 58.0 30.0 70.0 365.400 0.17 62118 <br />Conveyor flFt <br />Split Feed to Crusher Bins 100.0 12.22 1222 <br />Crushes to SDlitter Box 2 200.0 12.22 2444 <br />SplRer Box to Screen 2 250.0 12.22 3055 <br />Six inch Bypass 2 250.0 12.22 3055 <br />Sdeen Untlersize 1 750.0 12.22 9165 <br />Screen Oversize 1 770 0 12.22 9409 <br />Product to LOB 1 600.0 12.22 7332 <br />Processing Plant f/Cu.Ft. <br />Building-ADR 200.0 100.0 51.5 1,030.000 0.17 175100 <br />-ADR Addition 165.0 44.0 44.0 319,440 0.17 54305 <br />Building - ADR (New) 200.0 100.0 51.5 1,030,000 0.17 175100 <br />Pipe Access Gallery 60.0 10.0 10.0 8,000 0.17 1020 <br />Carbon Striping 8 <br />Regan. Equip. 2 107.0 25.0 45.0 120,375 0.17 40928 <br />Crusher Mainl. Bldg. 40.0 40.0 17.0 27,200 0.17 4624 <br />Seariry &dg. 40.0 20.0 10.0 8,000 0.17 1360 <br /> Number Diameter Height Cu.Ft. fICu.Ff. Cost <br /> <br />Carbon Columns 10.0 12.5 11.0 13.492 0.17 2294 <br />Carbon Columns Addition 5.0 12.5 11.0 6.746 0.17 1147 <br />Carbon Columns (New) 10.0 12.5 11.0 13,492 0.17 2294 <br />Solution Tanks Addition (1999) 2.0 12.8 30.0 7,657 0.17 1302 <br />Water Tanks 2.0 25.0 28.0 27,475 0.17 4871 <br /> Labor Equip. Houdy <br /> Hours Cost Cost Cost Cost <br />Fuel Starege <br />3400 gallon tank 8.0 76.76 BB 59 185.35 1323 <br />12000 gallon tank 16.0 76.76 88.59 165.35 2646 <br />Pnll Silas 4 8.0 76.78 88.59 185.35 5291 <br /> <br /> Total Demolition 610044 <br />• R.S. Means, Site WorkB Landscape Cost Data 2000, pg. 36. <br />• <br />Page 4 <br />